A 24-story building
constructed in San Diego California, U.S.A utilized a proprietary product
developed by BauTech to speed construction of heavily reinforced concrete
bearing /shearwalls around the elevator core.BauCages two-stories high by up to 3.7m wide are installed and then
quickly connected on their common vertical edges by insertion of
BauSplicegrids™ and then the charging of vertical locking bars. The
contractor reported a 50% labor reduction in cage assembly and 40% labor
reduction in cage installation.